Why Design / Build is
a better idea:
The Design/Build Process - A
Single Source Responsibility for your Total Building Needs
In today's construction market, the Design/Build
method of construction is recognized as the best and most
efficient way for an Owner to build. Experience is the key
element to this process; Building Technologies, Inc. has
been employing this method since 1968. Using Design/Build,
the Owner is able to place the responsibility for the project's
success under a single Design/Build contract with Building
Technologies, Inc.. The traditional competitive-bidding process
tends to pit building owners, design professionals, and developers
against their contractors. With Design/Build, the Owner becomes
a member of Building Technologie's Design/Build team, a partner
who will work with our professionals to develop the project's
specifications and design, and ensure that both budget and
schedule are met. Building Technologies, Inc. and the Owner
as a team can, at the earliest stages of the project development,
assist with long range planning, future budget forecasting
and introduce value-engineering solutions.
The major advantages that the Design/Build
method offers over the traditional method are:
a) Experience working for the Owner at
the initial project development.
b) Single source responsibility.
c) Guaranteed total costs before construction
begins.
d) Faster design and start of construction.
e) Greater flexibility for changes thanks
to direct communication
These advantages translate into the
following benefits:
1) Lower total cost.
2) Faster occupancy.
3) Greater customer satisfaction. The easiest
way to understand the advantages of the Design/Build method
is to illustrate the differences from the traditional method
with a graph.
|